I have been working on my basement during my parental leave. Hopefully I can get most of it done before I go back to work. And I hope it will be ready by William's birthday. :)
What was needed:
120 2x4's, 6 2x4x12, 8 2x4x10
16 2x2's
400 3" nails
65 2.5" power nails
120 2.5" wood screws
1 large roll of 6mm vapor barrier
6 large bags of R12 insulation
40 drywalls
2000 drywall screws
260' 14/2 NMD wire
100' 12/2 NMD wire
36' of copper pipe
2 doors
1 shower
1 toilet & sink
1.5 bruised thumb
1 helpful hand from my wife :)